But here it is anyway,
Also here is a picture of the front of my house on the first day of snow, December 9th...
You can also see the first Christmas wreath on the front door…
Now that is out of the way, I can return to the front hallway, I first put in new ¼ inch Luan and then the new hardwood flooring. Here are the pictures showing that process… I rented a pneumatic air gun that is specifically used for hardwood flooring. Basically it uses compress air and a rubber mallet to install the nails into the hardwood floors.
Here is a picture with the new hardwood floor installed on the first landing.
Here are pictures taken later in the day with the new hardwood flooring installed throughout the rest of the room. I’m really impressed with the new flooring. But I was also pretty exhausted after installing that floor.
With that accomplished, I decided to start another project. I decided it was time to work on the back hallway that connects the living room, bathroom, workout room and kitchen. The walls were painted a teal green. The drop ceiling will someday be taken down. That is the ceiling with the tin roof underneath. But I’m going to wait on that adventure at the moment.
Yup…bears and a light house with a sail boat…
The flooring was the same laminate flooring that was in the bathroom (before I change it). The edges of the laminate flooring are pealing up by the living room..
The back door had the original paint on the glass that the previous owners did.
Nice job on the paint…
Anyway, I primed the room and painted the walls the same color as the bathroom. The wall trim is painted with a cottage white that also matches the bathroom.
I removed the bears and decided to replace the junction box and switches.
Well the next step is to remove the laminate flooring and replace it with more peel and stick tiles. I plan on using the same ones that were installed into the bathroom. Anyway, until next time, happy building…
No comments:
Post a Comment