Thursday, September 11, 2008

The Second Floor

The second floor was really in bad shape. It honestly needed alot of work...here is a layout of the second floorThe hallway, in front of bedroom 2 and 3 had the pull downsteps to enter the attic. However the steps were missing.. So you clearly saw the attic...

Bedroom 2, was painted a horrid green... It looked like the green giant wanted to hide in the room.. The brown rug was stained with a mixture of green paint. The room smelled but I could not place the smell...

Bedroom 3, was painted a light pink... The hardwood floors were horrible..

Living room, was completely gross... The brown rug was stained and ruined. When the rug was removed there was only plywood for a flooring... The room was painted a hot pink color...

Bathroom... I can't explain it... But gross...

Kitchen, The fridge smelled and showed evidence of corrosion. The electric stove was missing... The cabinets were dirty and stained... The floor had green tile but was hopeless. Corrosion residue was found on the green tile floor... The hope was to salvage the cabinets.. The kitchen once had a washer and dryer... But I decided to remove both applicances for water safety sake...

No comments:

LinkWithin

Related Posts with Thumbnails